Specifications include, but are not limited to: BACKGROUND /OBJECTIVES The Eugene Water & Electric Board (EWEB) requests quotes (“Quotes”) for the furnishing of the labor, materials, and equipment for manufacturing, transportation, delivery, set-up, and cleaning of two new, movein ready manufactured homes to the project site, as required in the solicitation documents for this project. Manufactured homes shall meet all applicable building codes, specialty building codes, and requirements of the local municipality. Site preparation shall be completed by Owner or Site Contractor under separate contract. Site preparation includes concrete strip runner foundation and backfill, tie-downs, skirting, under-floor hook-ups for sanitary sewer, domestic water, and electric, gutters and downspouts, and concrete sidewalk. GENERAL: • Minimum 3 bedrooms, 2 bathrooms STRUCTURAL: • 125 psf design snow load • 2x6 exterior wallstuds 16” oc • 2x6 floor joists 16” oc • 5/8” floor decking • Metal drip edge • R-30 Ceiling insulation • R-22 floor insulation • R-11 wall insulation EXTERIOR: • Min 7.5’ sidewalls • Vinyl windows • No window trim • Sheetmetal roof • 4:12 roof pitch • Siding: Fiber cement lap siding and board & batten • Two GFI receptacles • Two exterior frost-free hose bibs • Exterior light at all exterior doors • Dead bolt locks on exterior doors INTERIOR: • Linoleum flooring throughout • Finished closets • Brushed nickel hardware • Laminated countertops with backsplash and edging • Full tape & texture • Finished ceiling drywall • Ceiling fan electrical and brace in main living area • Interior paint throughout