A. Contractor shall provide all necessary expertise, labor, equipment, materials, incidentals, and permits required to perform the needed repairs to the bridges North side footing including but not limited to: 1. Install cribbing and shoring as necessary to remove loose rocks, roots and debris from under and around the footing blocks. 2. Installation of concrete forms and rebar. Pour concrete to stabilize existing footing blocks. 3. Road maintenance work shall include the digging of rock, hauling and spreading of the pit run material in a single, six (6) inch lift rolled/compacted with a minimum three (3) passes with a roller. Water as necessary to achieve desired results, approval by visual inspection. B. The Work to be performed under this Contract shall consist of furnishing tools, equipment, materials, supplies, manufactured articles, and for furnishing transportation and services, including fuel, power, water, and essential communications, and for the performance of all labor, work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents.