Specifications include, but are not limited to: The purpose of the ITB is to establish a Contract for the Bank Stabilization at Banks-Vernonia State Trail (“the Project”). The worksite is along the west side at approximately 1.2 mile south of Beaver Creek Trailhead (trail mile 16.4) with a centroid of N45° 48’ 19.4”, W123° 13’ 35.2”, Columbia County. The selected Contractor shall furnish all labor, equipment, tools, supervision, materials and incidentals required to complete all the Work in connection with the Project in accordance with the Contract Documents. The Work will take place in Columbia County, Oregon. Work includes, but is not limited to, the following: 1. Mobilization 2. Perform Site Clearing and Grubbing/Salvaging and Preparing of Tree Trunks 3. Perform excavation and removal of slide/unsuitable material 4. Perform excavation to suitable subgrade for bench fill development 5. Furnish bench fill development with imported fill material 6. Furnish and install rip-rap