Specifications include, but are not limited to: This building was built in 1965 and went through an extensive renovation in 2012. Presently, the Thermal System Insulation in the boiler unit contains mudded joint packing as pipe insulation associated with the boiler unit. The pipes measure 20 lin. ft. There is also what appears to be mineral wool insulation in the ceiling of the same boiler room, that is old and deteriorating. There are red floor tiles and black floor tile mastic in the stairway entrance that are non-friable and contain asbestos, as per lab testing. In addition, there are crawlspaces that may be considered Permit Required Confined Spaces. The winning contractor will make these determinations and proceed appropriately while following all state and federal rules and regulations that may apply. A complete asbestos survey and sample result documentation will be available during the site walk-through.