Work for this project requires the contractor to be responsible for supplying all labor,
materials, equipment, utilities, miscellaneous items, freight and delivery and all
necessary valid licenses for the work summarized as follows:
1. Base Item No. 1 –Women’s Dorm (B0707) Electrical Room Door Panic
Hardware
2. Base Item No. 2 – Dining Hall & Culinary Arts (B1401) Electrical Room Door
3. Base Item No. 3 –Lumber and Equipment Storage (B2191) Metal Roof, Decay
Reconstruction, and Drainage
4. Base Item No. 4 –Urban Forestry (B2880) Entrance Landing, Stair, Handrail
5. Base Item No. 5 –Education (B2887) Masonry Repairs and Pointing
6. Base Item No. 6 –Hazmat Storage(B2892) Explosion Proof Ventilation
7. Optional Item No. 7- Lumber Equipment Storage (B2191) Roof Painting