18th Ave at Hilyard St (Eugene) 900366 1 LS Mobilization; 1 LS Temp. Work Zone Traffic Control, Complete; 160 HR Flaggers; 1 LS Removal of Existing Pavement Markings; 1 LS Erosion Control; 1 LS Concrete Washout Facility; 8 EA Inlet Protection, Type 3; 1 LS Construction Waste Reuse and Recycling (CWRR) Report; 1 LS Pollution Control Plan; 1 EA Removal of Inlets; 94 FT Mainline Video Inspection; 4 FT 6 Inch PVC Storm Pipe; 94 FT 8 Inch PVC Storm Pipe; 2 EA Concrete Inlet, Type 4A; 5 EA Catch Basin, with Steel Bike Proof Grate; 8 EA Adjusting Boxes; 1 EA Connection to Existing Structures; 1 EA Abandon Pipes in Place; 4 EA Connection to Existing Pipe; 65 TN Level 2, 1/2 Inch ACP Mixture; 90 SY 10 Inch Asphalt Concrete Pavement Repair; 111 SY Plain Concrete Pavement, Undowelled, 10 Inches Thick; 285 FT Concrete Curbs, Curb and Gutter; 1,250 SF Concrete Walks, Ramp, 4 Inches; 80 SF Truncated Domes on New Surfaces; 16 EA Bi-Directional Yellow Type I Marker; 5 EA Mono-Directional White Type I Marker; 1 LS Thermoplastic, Extruded, Surface, Non-Profile; 410 SF Pavement Bar, Type B-HS; 5 EA Pavement Legend, Type B-HS: Arrows; 3 EA Pavement Legend, Type B-HS: Bike Lane Stencil; 50 FT Curb Marking, Methyl Methacrylate; 12 SF Signs, Standard Sheeting, Sheet Aluminum; 1 LS Traffic Signal Installation, 18th Ave & Hilyard St; 1 LS Interconnect System; 360 SF Lawn Seeding; 390 SF Bark Mulch; 10 EA Irrigation Repair/ Relocation