Specifications include, but are not limited to: Prior to beginning structural demolition, the Seller shall request and obtain any permits and payment of permit fees. The Seller shall schedule the work in cooperation with City personnel to provide access. The Seller shall confine equipment and personnel within the boundaries of the identified work area during execution of the project. The Seller shall conduct asbestos abatement per the asbestos abatement design provided including all necessary samples, work plans, notifications, licenses, air monitoring, inspections, and disposal. oThe Seller shall conduct the work in accordance with its Site-Specific Health & Safety Plan (HASP). The Seller’s workers entering the exclusion zone shall have a current Hazardous Waste Operations an Emergency Response (HAZWOPER) certification. The Seller shall dispose of all asbestos containing debris in an approved landfill. The Seller shall be responsible for selecting the appropriate licensed disposal facility to which the asbestos containing material will be delivered and will obtain any required waste disposal approval(s) from the disposal facility. oManifests for disposal of materials will be provided to the City upon project completion. The Seller shall protect the existing amenities of the site during the project and be held liable for all resulting damage. These amenities include, but are not limited to, buildings, pavement, walkways, curbing, equipment, and vegetation, including trees. The Seller shall perform a pre-final site inspection with City personnel before Seller’s equipment and personnel are demobilized from the site. A punch item list will be generated identifying tasks to be completed. Any identified punch list items will be immediately corrected and/or completed to the satisfaction of the City. Assuming formal acceptance of work is granted, Seller’s personnel will remove equipment, materials, and temporary facilities from the site. Equipment will be disassembled once no longer needed. Areas where construction activities occurred will be left in a clean and stable condition prior to fully demobilizing from the site. All required record documents and other pertinent submittals, including final applications for payment, will be issued in a timely fashion after demobilization.