Specifications include, but are not limited to:CITY WIDE SCADA SYSTEM: Project consists of two major work components. The first component is the replacement of controls and instrumentation at the City’s twenty-nine (29) lift stations and three (3) water booster stations, with the added capability of remote monitoring and control. Proposed monitoring and control will consist of a new Server-Client Human Machine Interface (HMI) communications via a private cellular network. The second component consists of improvements to the Plant Control System at the Wastewater Treatment Plant. Work consist of replacement of the Programmable logic controllers (PLC), replacement of the implant PLC radio network with fiber optic network, configuration and programming of the existing ClearSCADA HMI and new PLCs. Work shall include related conduit and wire.