Specifications include, but are not limited to: The City of Tulsa is soliciting bids for the Supply of a 150 Ton Chiller and Installation Services. Chiller is to be compatible with the METASYS system currently installed at the AB Jewell Water Treatment Facility at 18707 East 21st Street in Tulsa, OK. Seller must provide their own equipment to load and/or unload material brought onsite for the installation. Coordination with plant staff for location of staging area is required. Seller is required to provide a 150 Ton Chiller, remove the existing chiller and install new equipment per industry standard. Disposal of existing chiller must be according to current environmental standards. Seller’s employees working on this project will be required to attend the City’s plant contractor orientation. A background check will be required of those employees working on this project. Seller will be responsible for all electrical and control work to integrate the new unit. Seller will provide a new thermostat if needed and new smoke detector, if needed. Seller will make any needed piping work modifications to connect new unit to existing pipes. New unit will have a factory applied protective coating that is resistant to hydrogen sulfide gas and suitable for use in a wastewater treatment plant. At a minimum the coating will be applied to the case, all coils, all refrigerant piping and all brass or copper components. Acceptable coatings include: Carrier E-Coat, Trane CompleteCoat, York Electrofin E-Coat, Heresite P-413C Baked Phenolic Coating. Other equivalent coating products will be considered through submittal approval process. Seller will touch up any coatings damaged during installation. Work will be performed Monday thru Friday 8am to 4:30pm, city holidays excluded. Seller will provide the City of Tulsa with complete operations and maintenance manuals. Seller is responsible for compliance with all applicable codes and regulations.