Specifications include, but are not limited to: 840 Research Parkway, Oklahoma City, OK 73104 Marley NC5202GR / 122671-001-97 1. Close cooling tower supply and return water vales as well as make up water valves 2. Inspect, clean and remove all mineral deposits and debris on air inlet fill, drift eliminators, hot deck distribution deck and nozzles and cold water basins. 3. Clean mineral deposits off basin heaters 4. Inspect and test basin heaters and pipe heat tapes to ensure proper operations. 5. Check for loose fasteners mounting gear box. Check oil level and be certain there are no oil leaks in hoses and fittings. Make sure gear box vent is open. 6. Check fan blades and hub fasteners. Check fan blade pitch and clearance. 7. Lubricate motor as required. Check mounting bolts for tightness. Record amp draw. 8. Clean two condenser pump strainers and lubricate motors as required. 9. Install XF-150 DE internal drift eliminators along inside of tower fill on both sides. 10. Repair any holes in cold water basin that appeared from the cold water basin cleaning. 11. Install lining in cold water basin with Belzonia like material. Lining will be applied on bottom of basin and up the sides and structural supports six inches above water line. 12. Provide and install as many as ten spot coolers inside building in areas specified while work takes place. 13. Open cooling tower supply and return water valves as well as make up water valve. 14. Return cooling tower to normal operation including restoring water flow from cooling tower through chillers 655 Research Parkway, Oklahoma City, OK 73104 Marley NC5202GR / 165554-001-00 1. Close cooling tower supply and return water vales as well as make up water valves 2. Inspect, clean and remove all mineral deposits and debris on air inlet fill, drift eliminators, hot deck distribution deck and nozzles and cold water basins. 3. Clean mineral deposits off basin heaters 4. Inspect and test basin heaters and pipe heat tapes to ensure proper operations. 5. Check for loose fasteners mounting gear box. Check oil level and be certain there are no oil leaks in hoses and fittings. Make sure gear box vent is open. 6. Check fan blades and hub fasteners. Check fan blade pitch and clearance. 7. Lubricate motor as required. Check mounting bolts for tightness. Record amp draw. 8. Clean two condenser pump strainers and lubricate motors as required. 9. Repair any holes in cold water basin that appeared from the cold water basin cleaning. 10. Open cooling tower supply and return water valves as well as make up water valve. 11. Return cooling tower to normal operation including restoring water flow from cooling tower through chillers.