Specifications include, but are not limited to: The City is seeking sealed bids for non-exclusive, as-needed concrete repair service to all facilities owned or within the control of the City of Miami and any of its affiliated entities, including but not limited to the Miami Special Utility Authority. Bids should be stated in terms of a linear feet/square feet rate. Rates shall include tools, transportation, machinery, and materials commonly on-hand for the trade, such as forms, ties, rebar chairs, stakes etc. The City of Miami shall supply all major material including concrete, rebar, baskets, paving fabric, geogrid and compaction/leveling rock. Contractor will be responsible for pick-up and delivery of same. Contractor shall coordinate with owner; all slopes, grades and compaction of proposed work prior to placement of formwork. All improvements shall be completed as per available standard construction details. Details are available upon request. Private property damaged by the Contractor shall be replaced at no cost to the Owner. Grass damaged during repairs outside of designated work area shall be repaired with a seed mix approved by the Owner. Sodded lawns damaged outside of designated work area shall be replaced in-kind in coordination between the Homeowner and the Contractor. Traffic Control shall be the responsibility of the Contractor. All traffic control shall meet the minimum requirements of the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD) Standards. Complete street closures will not be allowed and streets must be reopened at the end of each business day or prior to closing the next section of work. All positions must be licensed as required by the State of Oklahoma and registered with the City of Miami. Contractor shall be responsible for obtaining any required permits. City will waive permit fees as necessary for each work order. Successful contractor must be available with a 48-hour response time for all emergency calls, including after-hours calls. Non-emergency calls shall require no more than a 5-day response time. All work shall be completed in a timely manner.