Contractor is to furnish all manpower, materials, and equipment necessary, as required to complete the project in accordance with the contract documents including but not limited to the following specific items: 40,000 Gallon Water storage tank and concrete slab complete in place with all accessories as required by plans. 750 GPM Diesel Fire Pump and all accessories and piping as required by plans. Pre-engineered pump house and slab (include any electrical required to power pump house from new transformer). 2” Domestic Waterline including new tap, tap fees, and meter costs from county road to water tank. Coordinate with Rogers County Rural Water District #4. 1” Domestic Waterline from connection at 2” to within 5 ft of New Caretaker Home. 1” Domestic Waterline from connection at 2” to within 5 ft of New Shop. 6” Underground Fire loop around property including fire hydrants, valves, valve boxes, and all components required by plans. 4” Underground Fire line from 6” loop to new fire riser in barn. 4” Underground Fire line from 6” loop to new fire riser in Birthplace Home. Contractor shall include all plumbing, piping, accessories, and materials as required for a complete and functioning fire suppression system in accordance with plans and specifications. Contractor shall coordinate installation and filling of water storage tank using new 2” domestic waterline, water tanks, or combination thereof at contractor’s expense. Water tank shall be filled and tested prior to release of final payment. Crossings at existing paved roads shall be sleeved/bored? All trenching shall be completed in accordance with trenching requirements provided in plans. Contractor shall include an allowance for 600 LF of 2” waterline, including trenching and backfill, for back feeding of existing buildings on existing assumed 2” tap at Ranch entrance. Include allowance for making all connections required to make existing system functional, test and flush all outlets after reconnection and utility restoration All primary and secondary power shown on plans is by others. Contractor shall coordinate with other trades in the vicinity. Contractor shall include any required permits and coordination with state or local AHJ’s. Design drawings or calculations beyond those provided in the contract documents shall be the responsibility of this contractor.