Site Visit on 10/2/2025 at 10:00am Meeting place it the Admin Building.
Please refer to the attached documents.
Summary
The contractor will provide necessary labor and service to:
- Remove a total of 120 gallons (for the annual period) – used oil from two 30 gallon drum(s) located at the POL storage of the maintenance building. (2 times per year) And clean the cabinet catch basin as required or needed.
- Remove a total of 30 gallons (for the annual period) – used coolant from the 30 gallon drum(s) located at the POL storage of the maintenance building. (1 time per year)
- Remove a total of 100 used oil filters (estimated amount) – used filters from the 55 gallon drum(s) located at the POL storage of the maintenance building. (2 times per year)
- Remove a total of 1,500 gallons of oily water from the 1,000 gallon oil/water separator tank located at the southside of the maintenance building. (2 times a year)
- Clean the sand interceptor of the oil/water separator (2 times a year) in conjunction with the removal and the collection of the oily water.