Specifications include, but are not limited to: 1. Contractor is to furnish manpower and equipment necessary, as required by the project schedule, including interim milestone dates and to furnish additional crews, equipment, etc. and/or overtime required to maintain the schedule of Contractor falls behind due to their own fault or due to inclement weather. 2. Contractor is responsible for field engineering, layout and field layout from benchmarks and base building control furnished the Construction Manager. Rough-in requirements are to be dimensioned from column lines as shown on the contract documents. 3. Contractor shall furnish hoisting and material transport for the scope of this bid package. 4. Contractor shall furnish pumping and dewatering as required for the scope of this bid package. Any pumping performed must be done so as not to hinder the work of other trades. 5. Contractor will perform any sawcutting, patching and removal of debris as required for the scope of this bid package. The Construction Manager must approve the quality of any cutting and patching work. 6. Contractor shall furnish drinking water for its employees and its subcontractors employees for the scope of this bid package. 7. Contractor shall include all remobilization operations required to complete the scope of this bid package. 8. Contractor shall coordinate all material deliveries with the Construction Manager. 9. Contractor shall clean up his work in such a manner as to maintain safe working conditions on the project, including, but not limited to excess material, lunch trash and dirt and debris on streets and sidewalks. All trash generated from the Contractors work or its forces shall be removed by the Contractors own forces and equipment. Trash shall be placed in an on-site dumpster provided by others. Any waste that requires special disposal, such as steel, metal deck, concrete, pavement or hazardous waste will be disposed of by the Contractor and not placed in the on-site dumpster. Debris placed in the dumpster must fit within the confines of the dumpster. If, after a 24-hour notice, Contractor fails to clean up trash, the Construction Manager may clean up the trash and the cost shall be charged to the Contractor. 10. Contractor’s field supervisory personnel shall attend weekly project coordination meetings while performing work at the site. 11. Contractor shall conform to the Construction Managers work hours. 12. Contractor shall furnish protection of adjacent surfaces and repair any damage caused by the work of the Contractor. 13. The work shall be of sound and quality construction and shall comply with all applicable codes, standards and the intent of the Contract Documents. No claims for extra work will be honored by the Construction Manager for work which must be performed by the Contractor to meet code or standard requirements or to comply with the reasonably implied intent of the Contract Documents.