Selective demolition as follows: 1. Remove architectural, structural, plumbing, fire protection, mechanical and electrical materials and equipment as indicated or required for new construction. 2. Sawcut and remove concrete for drains, plumbing piping, etc. and where necessary to prepare for subsequent work. 3. Cut and patch roof for new roof curbs, and mechanical and electrical items. 4. Remove materials from site, and dispose of legally. 5. Disconnect, remove, cap and identify utilities for later reconnection. STEEL DECKING REPAIR A. Work includes, but is not necessarily limited to: 1. Remove existing steel decking, where required due to corrosion or where otherwise specified for replacement, by breaking welds or removing fasteners, and removing entire sheet. Replace with new decking per drawings and specifications. 2. Wire brush and prime paint surface rusted steel decking, where the level of corrosion does not necessitate deck replacement. 3. Fasten decking per drawings and specifications. B. If loosening, temporary supporting, and reattachment of deck-mounted equipment/piping is required for performance of decking replacement work, the Contractor shall provide the associated work under the appropriate bid price.