Specifications include, but are not limited to: Asbestos Abatement • The contractor will be responsible for removal of all asbestos-containing material according to the asbestos survey report prepared for this project and in compliance with all EPA, OSHA, and application State of Oklahoma regulations, and any other applicable law, using best practices. • The contractor shall submit the required notifications to any agency required to be notified. • The contractor shall furnish all labor, equipment, supervision, and incidentals necessary to provide complete asbestos abatement for the structure. • The contractor is responsible for all permits related to the project. • Should the use of a project monitor be required, the contractor must provide the project monitor, and all costs associated with the use of a project monitor. • Any additional cleaning required after the final cleaning will be performed at the expense of the contractor. • All hazardous materials must be handled and properly disposed of according to all applicable laws. • Any additional sampling costs shall be incurred by the contractor. • The contractor shall provide the final asbestos clearance inspection prior to conducting any demolition work. Demolition • Onsite disposal of materials or debris is prohibited. The contractor will be responsible for demolition, removal, and proper disposal of the following: o Structure and all its contents o Existing signs o Parking lot and driveway approach (to a point even with the curb line) o A/C Condenser units on the north side of the structure • The contractor will be responsible for all costs of transport and proper disposal of all demolition debris. • The contractor shall remove all footings and concrete slabs associated with the structure. • The contractor is required to use water for dust control during demolition, as needed. • All public streets, gutters, and sidewalks shall be clean of debris, dirt and mud during and at the completion of the project. Other Work • The contractor will also be responsible for meeting all stormwater runoff prevention requirements of the SWPPP permit as well as installing sod on the lot following the completion of work. The Authority will assume responsibility for irrigating the sod following installation. Certifications and Permits • The contractor will be responsible for obtaining all certifications and permits necessary for completion of the project from the appropriate regulatory agencies.