.Normal Season Pre-Opening Preparations: • Setup and prepare for usage of all movable equipment, furniture, and deck equipment. • Inspect all filtration equipment for prior to start up to identify any problems or concerns with normal operation. (Vales bin correction locations, skimmer pots in, etc) • Pump out and clean both surge tanks • Remove all leaves and debris from pool and bottom grading before filling. City will set up delivery of a water hose for quicker filling. • Make sure all VGBA grates are securely attached. • Make sure handholds on the climbing wall are secure and not loose • Clean out all gutters, main drain sumps, and skimmers prior to start up as needed. • Inject all necessary chemicals required to balance water chemistry. • Start up filtration system. • Clean and sanitize all bathhouse restrooms and facilities. • Clean and sanitize all concession stand equipment and room. • Install all water features if applicable. • Power-wash and blow off all deck areas of debris • Provide certification copies to the City of Edmond upon request • Provide computers and any software necessary to operate the facility (City will provide phones and internet access). • Perform facility inspection report of total facility. Provide detailed report to the City of Edmond on all deficiencies with the aquatic center including, but not limited to the swimming pool, buildings and structures, and the concession stand...