This work consists of but is not limited to installing all equipment per specification, sign or controller programming, labeling, and testing equipment. Submittals and Manuals Submit with bid a list of 3 projects of equal scope and references. Project Scope Current Environment The current LED video wall is end of life. The LED modules are failing and can’t be replaced or repaired. The video wall is flown from a truss in the lobby. Components Contractor Provided Description MFR MFR P/N QTY PL2.5 Plus V2 14.76’x8.20’ Absen PL2.5 Plus V2 1 Labor to install Labor Labor 1 Shipping Costs Shipping Shipping 1 Tariff Charges if any 1 CNE Provided Description MFR MFR P/N QTY All Network requirements All electrical requirements Miscellaneous – Contractor will provide all miscellaneous components to complete the install except the specific items listed in “CNE Provided” section above. This includes, but not limited to, cables, connectors, j-hooks, brackets, custom panels, labels, hardware, cable wraps, etc. Zip ties are not allowed. Summary of Requirements This project is to replace the LED video wall in the Grand Lobby. The vendor will remove the old video wall and install the new video wall. The video wall will be flown from the truss. All cabling needed for the new wall must be provided. The contractor will provide all serial numbers to CNE’s IT/AV team before installation begins. Contractor will work with CNE on the installation schedule. Due to the casino being open 24/7, early morning work hours might be required. Task Pre-Install – Contractor will meet with CNE IT/AV to develop a project timeline and a systematic install approach. Installation – Contractor will install all necessary components to complete the project. This will include components provided by CNE IT/AV. Conditions Work schedule will be coordinated with CNE IT/AV. Contractor is responsible for keeping all work areas clean. Equipment – Contractor is responsible for procuring and installing all components needed to complete this project.