Carpentry: BEDROOM #3: 1 Ea Attic Access Scuttle Hole with Door. Install new attic access scuttle hole. Frame opening and install plywood door finished to match existing. Weatherstrip edges and attach R-30 batt. Upstairs to access atic on front side of house; 60 SF Paneling/Wood/ Install new 3/8 paneling. Build a chase around any exposed duct work upstairs and cover with 3/8s AC plywood approximately 20' long; HVAC: HVAC: 1 Ea HVAC /PACKAGE UNIT/ Heating & Cooling, 2.5 TON/14-15 SEER./NATURAL GAS HEAT; Includes Duct necessary electrical wiring. Install a 3 ton propane up-flow this is a new install there is no exsisting. Run duct into attic onon each side of house to supply the rest of the house with 4 registers on the short wall up stairs and 1 in each room and 2 in the living room; Plumbing: EXTERIOR: 25 LF Gas Line/Remove All Existing Lines/ Replace With New Gas lines and Shut-off valves, Pressure Test Before Connecting. Replace copper lines with black pipe mounted on ext of the house to cook stove and wall heater hook cook stove back up and leave wall heater shut off; 54 LF Gas Line/Replace the Existing Yard Line/ Replace With New Gas line and Pressure Test Before Connecting. Run new gas line mounted on the house around to new package unit. Ther is no exsisting; 36 LF Gas Line/Replace the Existing Yard Line/ Replace With New Gas line and Pressure Test 36 LF Before Connecting. From tank to house