Carpentry 1 Area: BATHROOM #1: Door Opening/Widen/Interior/Bathroom/Widen/Install new door/ pre-hung. Work shall include new door, framing, lockset, floor transition, paint and trim. Widen the bathroom door to a 2'8", the existing door is 2'0". Floor System/Replace. Replace entire floor system, include rim joists, floor joist, mudseal, 3/4" T&G subflooring. Replace floor joist where needed. 3 Area: EXTERIOR Div.# 16.A 13 LF /6.V. Wheel Chair Ramp/Wood/Install new 4' wide Treated Wood wheel chair ramp, with balusters, handrails on both sides and concrete landing at the bottom. Install where existing ramp is located. Drywall & Finish Drywall/Moisture Resistant/Replace. Replace existing drywall with new moisture resistant drywall- 1/2". Interior Drywall or written approved Install around the new shower.