1203.1 The Seller agrees to load biosolids stored within the storage beds at the Southside Wastewater Dewatering Facility, with a percent total solids greater than 10%, transport and unload the biosolids at a location 35 miles round trip or less per these Specifications. Bid is unit price per cubic yard. 4800yd3 $ $ 1203.2 The Seller agrees to load biosolids stored within the storage beds at the Southside Wastewater Dewatering Facility with a percent total solids of less than 10%, transport and unload the biosolids at a location 35 miles round trip or less per these Specifications. Bid is unit price per cubic yard. The dewatering facility is located approximately ½ mile east of 71st Street and Elwood Avenue. 1200yd3 $ $ 1203.4 Cost per mile for each 30 cubic yards hauled from Southside Wastewater Dewatering Facility further than 35 miles round trip per these Specifications. Bid is net price per 30 cubic yards per mile. 1,000 miles $ $