1. Evaluate facilities with incoming power of 480V 3-phase or higher for arc flash hazard. 2. Collect data to identify circuit breakers, cable sizes, and cable lengths between panel boards and equipment. 3. Provide a detailed report and determine any needed system repairs. 4. Provide all required arc flash labeling. University prefers to include a QR code link to the one-line drawings. 5. Electronically receive AutoCAD drawings to encompass a complete file for future construction projects. 6. The supplier will be listed as a contact for future remodel projects to supply this information timely. 7. Develop recommended requirements for personal protective equipment (PPE) to work around electricalpanels. 8. Provide a detailed IR report with images, temperature differentials, and corrective action recommendations.