Specifications include, but are not limited to: 1. Demolish the existing station transformer, auxiliary transformer, pavement, and brick enclosure around this equipment as shown on drawings. Remove underground conduits and duct bank in areas not overlapping with new construction. 2. Provide site preparation, grading, pavement, and site restoration. Replace existing pavement and extend pavement drive to access Duke Energy equipment. 3. Install concrete-encased underground duct bank from standby generator to Automatic Transfer Switch, Utility step-down transformer, Station step-up transformer, and into the facility. 4. Furnish and install one (1) enclosed fused disconnect switch for isolation of utility power feed. 5. Furnish and install one (1) 750kVA diesel engine generator sets with selfcontained double-wall fuel storage and sound/weather enclosure. 6. Furnish and install one (1) 1200A enclosed outdoor-rated automatic transfer switch (ATS).