Specifications include, but are not limited to: (1) Seal- Secure loose framing and remove loose sealant and seal where missing at windows, frames, and stops. (2) Wet Seal caulking of all windows that include perimeter caulk of all windows on 5th floor east elevation open to cause leaks below. Wet seal caulk of vertical window frames located on the east elevation North side of the building. (3) DOW 795 industrial sealant to be used to perimeter caulk each window and frame located in the first bay on the northeast corner of the building. All work to be completed on Saturday. 85' aerial lift to be picked up and delivered from site. ** Vendor to quote complete cost including associated labor and materials needed to seal all widows and frames open to cause leaks using top quality sealants. Cost to include the use of an 85' articulating lift.