Specifications include, but are not limited to: Disassemble, remove, and discard of existing walk-in cooler and walk-in freezer and their existing refrigeration units, including all the components the awarded Contractor will be replacing, as described herein, at Trumbull Correctional Institution Camp. 3. Install the new, indoor use, walk-in cooler and new, indoor use, walk-in freezer including their refrigeration units, and all necessary components to complete the units in the existing space at Trumbull Correctional Institution Camp, meeting all requirements described herein. 4. Pour Concrete slab and install surrounding fence for the two (2) new walk-ins’ condensing units at Trumbull Correctional Institution Camp. 5. Disassemble, remove, and discard of the two (2) existing walk-in freezers’ refrigeration units and the three (3) existing walk-in coolers’ refrigeration units, including all the components the awarded Contractor will be replacing, as described herein, at Trumbull Correctional Institution. 6. Install the Refrigeration Units and all necessary components for the two (2) existing walk-in freezers and three (3) existing walk-in coolers at Trumbull Correctional Institution, meeting all requirements described herein.