Specifications include, but are not limited to: construction of a shared use path from Madison Road to Eastern Hills Lane along the former railroad corridor. The work involves construction of new asphalt and concrete pavement to connect trail to existing Wasson Phases and future phases to east. The work of this contract includes the following: performing brush removal, tree stump removal, earthwork, constructing curbs, curb ramps, concrete walk; constructing asphalt and concrete paved trail; constructing storm water facilities; construction of a new traffic signal installation, as well as modifications to two existing traffic signals; constructing poured in place retaining walls; constructing pre-fabricated modular retaining wall, performing the necessary pavement marking work