Specifications include, but are not limited to: For the E. 79th Street Station, the Signal Engineering firm shall: 1. Provide the required construction documents for the installation of a new railroad crossing gate and its integration into the existing GCRTA signal system. System will be setup similar to the E. 34th Street Station and should meet the requirements of the Ohio Manual on Uniform Traffic Control Devices. 2. Provide the required construction drawings for relocating the existing E189JB Junction box located on catenary structure E-189 which will be replaced as part of the project. E189JB feeds impedance bonds WE-193 and EE-178. The impedance bonds will remain in their current location. 3. Review and respond to Bidder’s questions during the Bidding Phase of the E. 79th Street Red Line Station Reconstruction as it relates to the signal design.