Specifications include, but are not limited to: The Contractor shall furnish materials, labor, tools, equipment, incidentals, and all bypass operations, if needed, that are required to complete the Reconstruction of pipelines specified and as shown on the drawings. Including sanitary sewers S-77, S-124, S-189, S-189A, S-218, S-218A, S-218B, S-233, and S-233A in The Village of Ottawa Hills. Sewers shall be cleaned and televised by the Contractor prior to installation of the new CIPP, and upon completion of installation. After the pipe has been cured, the Contractor shall reinstate the existing active service connections The Contractor shall furnish materials, labor, tools and equipment to properly collect, transport, and dispose of debris resulting from the sewer cleaning.