Specifications include, but are not limited to: 1. Survey shall include topography points within an 80 foot corridor, 40 feet on each side of existing centerline including the intersection with Poppy Drive and Marshall Road. Utility locates will be required. 2. Semi-permanent control points with X, Y and Z coordinates no further than 500 feet apart. 3. All points/shots with point numbers, descriptions and elevations, including storm sewer and sanitary sewer data. 4. Digital Terrain Model (TIN) with contours. 5. Temporary BM’s along the project and outside the work limits. 6. Line work of all existing utilities, driveways, walks, culverts, buildings, fences, lots, valves, trees (including diameters), utility poles, monuments, and all underground utilities, etc.shall be per ODOT’s CADD (Autodesk) requirements. 7. Copies of all documents. 8. The final product or drawings shall be submitted in an AutoCAD 2016 or later format reflecting ODOT line styles, patterns, symbols, plot style table, etc. and provide any technical assistance needed to upload data into Autocad.