For the purpose of seeking SOQs for this Project, SWACO has developed the following preliminary Scope of Services. The final Scope of Services for the Project may include any, all, additional, or none of the following elements to be performed at any of SWACO’s facilities. Please note, Proposers are not required to perform all the following tasks to qualify for a contract. If you do not perform all tasks listed below, please indicate in your SOQ submission what services you do perform. I. Engineering Placement of waste planning within FCSL Strategic planning and sequencing facility construction efforts Feasibility Studies Surface water conveyance issues General leachate collection system and gas collection and control system consulting General electrical engineering design and consulting Services related to operational requirements of FCSL “Permit To Install” Computer Aided Design & Drafting (CADD) Providing surveying services Preparing drawings and bid specifications for projects Providing support services during construction Providing Construction Quality Assurance Services as well as certification reports Providing other professional consulting services and technical assistance on an as needed basis Provide design services as needed II. Compliance Services related to environmental regulations, geology, hydrogeology, storm water, and wetlands Completion of Annual Operational Report Environmental and compliance audits Advice and assistance with interaction with various regulatory agencies BUSTR compliance Special waste assistance Surface water EDMR submittals (as SWACO backup) Surface water sampling (as SWACO backup) Air Compliance Services (as SWACO backup) III. Permitting & Plans Solid Waste Permit modification and alteration requests NPDES Permit renewals Revisions to SWPPP/SPCC/Slug plans Emergency response plans Surface water permitting requirements Revisions to Explosive Gas Monitoring Plans