Specifications include, but are not limited to: Cornelia Park Equipment: GameTime - Xscape Play Structure; (16) Game Time - 12" Playground Border; GT-lmpax - 1,920 Sq Ft (95 CY) of Engineered Wood Fiber at a 12" Compacted Depth; Crenshaw Park Equipment: GameTime - Installation of The New Equipment, Curbs, and Surfacing - Option 1: Structure; 4 bay Swings; Skyrun zip track 53'; Vista Rope Race 7; Arch Swing; Space Loop; Whirlwind seat; 6 Benches with extensions; 8,000 SF EWF; 89 Curbs and 1 Access Ramp; Garaux Park Equipment: Game Time - Installation of The New Equipment Includes: Vista Tree Top 5; 100' SkyRun Zip Line; Sensory Wave Comer Arch; Trinet w Socket; 5 Hex Pods; Splitter w Craig Climber; Vista Twist Tower 3; Fusion; Thrive 450 with Shade; 5 Benches; 10' Cantilever Shade; 7,206 SF EWF; 129 Curbs and 1 Ramp; Harmont Park Equipment: Game Time - Installation of the structure, Saucer Swing, Stargazer, Curbs, and EWF Surfacing; Installation Deadline: Installations of all equipment at all four parks must be completed by July 30, 2024. Please refer to the Liquidated Damages section of the Invitation to Bid. Bring in soil and grade site to match surrounding play area to create a site with smooth installation. Seed and straw disturbed areas. Stone is calculated @ 4" prior to compaction. This will be a turn‐key project with the contractor supplying all labor, tools, equipment, and materials to complete the project according to the specifications and drawings.