Specifications include, but are not limited to: Task 1. Basin Inspection and Evaluation 1. Provide a comprehensive inspection and assessment of Accelator basin 3 & 4, including but not limited to the following: a. Inspect the structural integrity of the supports for the hood and overall system b. Inspect the rotor impellers c. Inspect condition of draft tubes, launders, hood, sludge scrapers, sumps d. Check system for true, plumb, level, concentricity e. Evaluate the system, determine what is causing the torque that causes system to be out of true f. Evaluate bearings that continue to break every 3-6 months 2. Evaluate Euro drive that replaced the original Faulk drive 3. Evaluate the effectiveness/necessity of cathodic protection 4. Provide Report of findings and recommended repairs, including probable costs Task 2. Concrete Inspection and Evaluation 1. Provide inspection plan: visual, non-destructive, destructive testing (if necessary) a. Provide resume of inspector’s previous experience 2. Thorough condition assessment of the basin 3 & 4’s concrete a. Cracking, spalling, leaching b. Evaluate previous repairs c. Material deterioration d. Exposed rebar 3. Provide report of finding and recommended repairs, including probable costs Task 3. Coating Evaluation 1. Provide an inspection of the existing coatings of the basins a. Membrane coating, interior of basin b. Exterior coating, outer wall of basin c. Inside basement coating 2. Provide report of findings and recommended repairs, including probable costs