Specifications include, but are not limited to: SPECIFIC REQUIREMENTS: 1 Remove the building and foundation to a minimum of two (2) feet below final grade. 2 Remove the yard walks and steps. 3 Back fill the basement with clean earth or rubble fill. Spread an average of six (6") inches of clean earth over the rubble fill. 4 Grade the lot to conform to existing contours, unless otherwise specified. 5 Close opening in wall at steps with stone set in mortar. Provide weep holes at base and back fill with gravel. 6 Remove steps from the public sidewalk, repair walk in accordance with specifications of the City Engineer. (Seperate permit is required by the Engineering Division.) 7 Protect all property line fencing during wrecking operations. Property line fence to remain unless otherwise specified. 8 Take necessary steps to protect the adjoining property. 9 Grade variations in excess of 48" must be reduced accordingly or protected by a 4' high chain link fence. 10 Remove parking area and drive apron (rear) off Wickham Place. Repair curb and sidewalk in accordance with Department of Transportation and Engineering requirements. (Separate permit, inspection and approval from DOTE is required.) 11 Remove all trash, rubbish, weeds, and brush from the entire site. (Protect all large mature trees and remove dead trees) 12 Spread seed and straw in accordannce with the standard specifications over 6" of clean earth that is free of rocks and rubbish. 13 Contractor may be required to provide a Waste Shipment Record for any asbestos the contractor has had removed under the contract. Affidavit of Original or Sub-Contractor (Labor and Material) Purchasing Form 66, shall include demolition debris disposal and name of approved demolition debris disposal site. Disposal receipts and/or proof of lawful disposal must be provided to the City upon request.