Specifications include, but are not limited to: 1. Work Included: Furnish all labor, materials, equipment and submittals necessary to develop Standard Operating Procedures. 2. Description: The Consultants shall conduct interviews with Plant Operations; Plant Maintenance; Plant Electrical and Supervisory Staff to gain perspectives on the Plant Operations and to determine what is necessary for the development of the Standard Operating Procedures. Such meetings shall be scheduled a minimum of 2 weeks in advance. 3. Use of Color Graphics: Consultant shall use color graphics in the development of the SOP’s. Graphics include photographs; diagrams in vizio; flow charts in vizio; panel displays; screen shots; etc…. 4. Deliverables: The preferred media for the submittal of SOP’s shall be electronic format: Microsoft Word (password protected); Acrobat Adobe PDF; Powerpoint (as necessary). All such format shall be easily incorporated and used in the SCADA system as a pull down document. Additionally, such format shall be easily incorporated in a Division Intranet webpage. Such SOP’s shall be delivered electronically plus twelve (12) original and bound color copies. Additionally, Consultant shall provide the entire contents of the SOP’s on flash drives for each employee (80 total).