01 Mobilization 1 LUMP SUM 02 Traffic Control 1 LUMP SUM 03 Silt Fence 318 LINEAR FEET 04 Turbidity Curtain 100 LINEAR FEET 05 Temporary Steel Sheet Pile Cofferdam 1 LUMP SUM 06 Disassemble and Remove Existing Pavilion 1 LUMP SUM 07 Remove and Dispose of Existing Floating Docks 1 LUMP SUM 08 Remove and Dispose of Existing Fixed Gangways 1 LUMP SUM 09 Remove Existing Bollards 12 EACH 10 Remove Existing Concrete Surface 986 SQUARE YARD 11 Remove Existing Asphalt 1,341 SQUARE YARD 12 Remove Concrete Curb and GuƩer 396 LINEAR FEET 13 Remove ExisƟng Chain Link Fence 430 LINEAR FEET 14 Abandon ExisƟng Concrete Vault 1 LUMP SUM 15 Abandon ExisƟng Concrete SepƟc Tank 1 LUMP SUM 16 6” Concrete Base, Class QC1P, ODOT Item 305 200 CUBIC YARD 17 Concrete Ramp Surface, 8-inch 7,625 SQUARE FEET