Specifications include, but are not limited to: The contractor shall install and provide all faucets and flush valves and any necessary materials and equipment required for proper installation. 2) The contractor shall determine if any permits are necessary and shall procure necessary permits and/or inspections. 3) The contractor shall turn off the water to each fixture during replacement. If there is a specific requirement to turn off water to an entire restroom, the City will accommodate that need with a 48 hour advance notice. 4) The contractor shall remove the old faucet/ flush valve and dispose of them. 5) The contractor shall install new fixtures according to standard plumbing codes, and manufacturer suggested installation instructions.