Specifications include, but are not limited to: The Contractor shall furnish all materials, equipment and tools necessary to complete the asphalt paving complete in place on roadway acceptable to the County Engineer. All materials shall meet current O.D.O.T. Specifications and shall come from a source certified by O.D.O.T. All equipment shall meet current O.D.O.T. Specifications. The contractor shall clean and otherwise prepare the surface for paving. Bridge treatments shall be directed by the Engineer in order to provide a smooth road surface. No asphalt shall be placed on bridges without authorization from the Engineer. The contractor shall place a butt joint across the entire width of the roadway as directed by the County Engineer to provide a level transition from new asphalt to existing pavement. Contractor shall apply liquid asphalt and seal edges of new to existing pavement at beginning and end of overlay and intersections, including butt joints. Butt joints and feathering at bridges and intersections should comply with ODOT standard construction drawing BP-3.1. A temporary center line shall be applied to the roadway after asphalt has been placed on roadway. The cost of the temporary center line and planing shall be included in the unit price per ton bid for asphalt concrete.