This project consists of unit upgrades to a 4 bedroom C-Type Townhome unit to include: remove and replace flooring throughout the entire unit, replace vinyl base throughout the entire unit, replace stairway treads, replace all baseboard heater covers, all kitchen cabinets, bathroom mirrors and vanities replaced, bathroom sinks and faucets replaced, install bi-fold closet doors in all 4 bedrooms, replace all (4) bedroom doors, replace all (2) bathroom doors, all (7) blinds replaced, install covers on all light fixtures, replace refrigerator, replace (40 gal) hot water tank, replace range stove, remove and replace (2) toilets and toilet seats, repair drywall and paint as needed. The work includes all permits, labor, materials and equipment for the work per attached scope of work. All quantities + measurements provided are approximate. Contractor is to verify all measurements + quantities in the field.