Specifications include, but are not limited to: This project shall include, but will not necessarily be limited to, replacing existing wood frame and glass pane windows and doors meeting GSA Condition 3b for blast resistance, and UL rating Level III for ballistic protection performance. Scope will also include integration of door replacements with current access control systems. The selected A/E will be retained to complete the POR, design, and construction administration for window and door replacements. Upon award of the Agreement, the selected firm will commence by developing the POR. The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner’s project requirements. The selected A/E will participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement.