PERFORMING SLOPE REPAIR OF A LANDSLILDE ON THE RIGHT SIDE OF EASTBOUND SR-2, INSTALLATION OF NEW CURB AND TIED-BLOCK MATS TO CONTROL EROSION ALONG THE OUTSIDE SHOULDER ON THE LEFT AND RIGHT SIDE OF SR-2 AND ALL RELATED WORK. 0001 ROADWAY 0001 201E11001 CLEARING AND GRUBBING, AS PER PLAN 1.000 LS 0002 202E23000 PAVEMENT REMOVED 60.000 SY 0003 202E30701 CONCRETE BARRIER REMOVED, AS PER PLAN 137.500 FT 0004 202E32000 CURB REMOVED 18.000 FT 0005 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER 60.000 FT 0006 202E38000 GUARDRAIL REMOVED 325.000 FT 0007 202E38200 GUARDRAIL REMOVED FOR REUSE 570.000 FT 0008 202E42806 ANCHOR ASSEMBLY REMOVED FOR REUSE 1.000 EACH 0009 202E47200 BRIDGE TERMINAL ASSEMBLY REMOVED FOR REUSE 2.000 EACH