The Contractor shall be responsible for the following: The 53’ Drop-frame Trailer shall be custom built, meet all DOT requirements and include the following specifications: Shall be equipped with air brakes and ABS brakes (No Exceptions) Tandem Axles (Hendrickson) Kingpin shall be placed at 24” Exterior walls shall be constructed of .100 aluminum sheets with no screws or rivets showing and shall not be affixed with tape (No Exceptions). All exterior trim shall be polished stainless Fully R-13 Insulated Trailer The Chassis shall be fully welded Air-Ride Suspension System (No Exceptions) Michelin Radial Tires with all rims Alcoa polished rims Aluminum Drop Ceiling All LED Lighting (No Exceptions) Electric Flash Hydraulic Landing Gear (front and rear) with each leg independently adjustable. Fully Skirted Underside 38kw Diesel Generator (ex. Power Tech. or equivalent with horizonal air intake and exhaust) Generator Compartment with Acoustic Foam (Exterior - mounted on front of trailer) 100 Gallon Diesel Fuel Tank (40 Hour Run Time) Shoreline with 30-amp service and 150’ umbilical cord Exterior Convenience Outlets (minimum 4) | Interior (minimum 4 each level) Convenience 110V Outlets Exterior Scene Lighting (LED) (both sides and rear) Interior lighting shall be LED and zoned (minimum 3 zones) Two (2) 36” x 80” Entry and Service Doors Entry Stairs, to be determined by customer at final drawing acceptance (ex. platform, stow-away, manual fold -up still allowing for full door operation) LED Lights provided at all steps and doors (No Exceptions) Under Storage Area if Platform and Entry Stairs are chosen The roof on the 53’ trailer shall be mechanically raisable/lowerable to comfortably accommodate a 2-story floorplan. A hydraulic movable/raisable deck shall be affixed to the rear of the trailer to simulate a deck/balcony. The deck shall have safety railings and access points to accommodate laddering the platform. The movable deck shall have a battery back-up system. Interior Search and Rescue layout and specifications: Interior stairs to the second floor shall be of a scissor style and be located at the tongue platform step-up. Coin Mat Durable Flooring throughout Interior Permanent Walls 1/2 “BCX” Plywood Walls / With All Walls skinned with aluminum Two (2) forcible entry doors shall be included in the interior layout (COM to specify). Two (2) forcible entry windows shall be included, (1) interior layout and (1) on exterior deck/balcony (COM to specify). Heat Ducts to service both floors. Zoned at individual vent openings Exterior inlet to accommodate a 350K to 500K btu heater Vendor to provide a 350K to 500K btu heater (Approved by COM). Smoke Ducts to service both floors. Zoned at individual vent openings Exterior inlet to accommodate a “smoke machine” (COM to specify). Fans (4) medium sized to move fresh air throughout the trailer (minimum of 8,000 CFM). First Floor Layout: Configured to look like a small apartment, which includes a bedroom, living-room, non-working kitchen and non-working bathroom. All furnishings shall be constructed of non-destructible material. Second Floor Layout: Open floorplan with portable 4-foot-wide panels to layout different room configurations (COM to determine number of panels). Panels shall be constructed of aluminum and have attachments to connect to the wall, ceiling, floor and other panels. The floor shall be laid out in a grid system with pockets so that the panels can be secured into the floor. Exterior Paint shall be black (approved by COM) and the base/clearcoat shall be wet sanded and buffed to a show finish. Exterior: Provide an allowance for total wrap package of trailer for graphics. Trailer shall Include a 2-Year Warranty (minimum). Training: The Contractor shall provide a comprehensive user training to all users (identified by COM).