1. Specific scopes of work to be completed by the prime contractor include: a. Coordination with the owner’s splashpad installation contractor b. Concrete demolition in existing storage room of the restroom building c. New water tap, extension, meter, backflow, and pressure reducing valve. d. Relocation of existing 2” water tap in the storage room of the restroom building e. New floor drain in splashpad equipment room including connection to existing plumbing, concrete removal, and replacement as needed. f. Interior concrete floor re-pour in existing storage room of the restroom building after splashpad controls and plumbing are complete g. 6” sanitary lateral, 2x2 basin, solid lid, 4” trap, funnel, air gap, and 4” backwater valve. h. All exterior concrete pavement that connects to the “oval” splashpad i. The synthetic grass adjacent to the “oval”