Specifications include, but are not limited to: The 2024 Resurfacing and Miscellaneous Paving – Phase 1 project is a citywide resurfacing project that includes numerous streets in each ward for approximately 20 centerline miles of resurfacing. Major project components include the removal of the asphalt surface course, adjusting of manhole and valve box castings by riser rings, intermediate course paving (as directed) and surface course paving. Additional work may include additional asphalt depth removal, underdrain installations, subbase replacement, manhole casting and valve box adjustments, base course asphalt paving, intermediate course paving and railroad coordination as directed by the Engineer. The contractor who is awarded the 2024 Resurfacing & Miscellaneous Paving – contract will provide the following: 1. Pavement removal and replacement where directed by the Highway Maintenance Superintendent, on various streets and parking lots throughout the City. 2. Surface and Intermediate Course Removal and/or placement on limited access highways. 3. Pavement overlays as directed by the Highway Maintenance Superintendent or his agent (strip patching).