Bid Package 1: DC Rectifiers. In substation room 10B (see electrical portion of the 2022 Assessment) the current main AC feed is converted to DC via the rectifiers. The intention is to disconnect the DC rectifiers; convert all effected exhaust fan motors, panels, and subpanels to AC; add additional panel boards; and add additional equipment and/or disconnect switches as necessary for a functional system. The DC equipment not required for exhaust fans or other Public Auditorium purposes should be removed. The intent is to retain as much of the existing wiring and conduit as possible. Patch and repair floors, walls or ceilings effected by demolition or construction. Bid Package 2: The Click Clack Room. This electrical room (see electrical portion of the 2022 Assessment) is fed from the main feed in substation 10B. The intention is to replace the existing obsolete fused breakers with modern electrical panel boards within this room. It would also, include replacing all the branch circuit panels fed from the fused breakers. The equipment within this room no longer required for the function of the system should be removed. The intent is to retain as much of the existing wiring and conduit as possible. Patch and repair floors, walls or ceilings effected by demolition or construction.