A. These design/build services are required for the replacement of thirteen (13) PBBs and ancillary equipment including preconditioned air (PCA) units, solid state frequency units (SSFM or GPU), and potable water cabinets (PWCs), as well as other possible site work, such as foundation demolition and construction. All equipment and PBBs shall be newly manufactured. No refurbishments will be permitted. The scope shall also include any and all architectural and structural modifications to complete the bridge connections to the terminal building. B. The 13 gates, included as part of this project, are the following. Refer to Figures 1 and 2, on the next page, for gate locations. 1. Concourse A: Gates A1, A3, A5, A7, A9, A11, A12, A14 2. Concourse C: Gates C2, C4, C8, C10, C14 C. All gates must accommodate narrowbody aircraft, with the minimum aircraft being serviced, the E170. The critical design aircraft for each gate is the A321-NEO and the B737-10MAX. D. Gate A14 must accommodate widebody aircraft capable of servicing up to an A350-1000.