0001 ROADWAY 00001 201E11000 CLEARING AND GRUBBING 1.000 LS 00002 202E20010 HEADWALL REMOVED 1.000 EACH 00003 202E23000 PAVEMENT REMOVED 3,153.000 SY 00004 202E23000 PAVEMENT REMOVED 2,462.000 SY 00005 202E23000 PAVEMENT REMOVED 4,556.000 SY 00006 202E30000 WALK REMOVED 13,713.000 SF 00007 202E32000 CURB REMOVED 1,778.000 FT 00008 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER 584.000 FT 00009 202E58100 CATCH BASIN REMOVED 5.000 EACH 00010 202E75000 FENCE REMOVED 405.000 FT 00011 202E75251 GATE REMOVED, AS PER PLAN 2.000 EACH 00012 202E98100 REMOVAL MISC.: 1.000 EACH 00013 202E98100 REMOVAL MISC.: 15,000.000 EACH 00014 202E98200 REMOVAL MISC.: 50.000 FT 00015 203E10000 EXCAVATION 9,328.000 CY 00016 203E20000 EMBANKMENT 4,189.000 CY 00017 203E20001 EMBANKMENT, AS PER PLAN 100.000 CY 00018 204E10000 SUBGRADE COMPACTION 21,513.000 SY 00019 204E13000 EXCAVATION OF SUBGRADE 2,815.000 CY 00020 204E13000 EXCAVATION OF SUBGRADE 1,338.000 CY...