Specifications include, but are not limited to: obtain Professional Architectural/Engineering (A/E) services for the design of: Shirley Rogers stairwell replacement which is needed due to extreme corrosion that the current steel stairs have suffered from salt applications from winter snow & ice removal. An enclosed stairwell with heat will be constructed so salt will no longer be needed for winter condition safety, this will greatly enhance the longevity of the new stairs. Harmon ADA wheelchair ramp needs to be repaired or replaced and replacement of deteriorating front stairs at Harmon building while adding a wheelchair ramp in this area for proper ADA access. Clearview School masonry and foundation repairs from settling observed at the entrance and office doors. Determine and rectify settling cause as water appears to flow towards building at interior corner on North side. In addition, repair of the brick façade on rear of building will need performed along with replacement of flashing on wall cap as it appears to be the cause of issue. Medical area renovations are needed to make better use of available inaccessible space in the area, the following renovation/remediation work includes removing doors, combining pill pass with pill storage, repair existing walls and replace or repair the patient call system. ORW has other renovation requests that will be included if the project budget allows. All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority(ODRC) and/or Owner’s (ORW) policies and procedures.