The Work will consist of removing and replacing RTU’s through-out the Wood County buildings located at the Gypsy Lane Complex. Work will include but not be limited to providing the crane for various locations, installing a min split at the JRC building, disconnecting the old RTU units and salvaging them, then installing new RTU units, testing and balancing as well as disconnecting and reconnecting controls of each unit is also required. Replacements of RTU’s will need to be done such that each building has limited down time and/or vacancy time. In some cases, minor duct repair or replacement/coordination is required as well. In addition to this being the major portion of the project, two valves in the jail mechanical will also need to be replaced.