ROADWAY 201 Clearing and Grubbing 1 Lump 202 Guardrail Removed 500 FT 202 Fence Removed 50 FT 203 Excavation, Including Pavement Removal 155 CY 203 Embankment 118 CY 606 Guardrail, Type MGS 125 FT 606 Anchor Assembly, MGS Type E 4 Each 606 Bridge Terminal Assembly, Type 1, As Per Plan 4 Each 626 Barrier Reflector, Type 2 4 Each Sub-Total = PAVEMENT 204 Subgrade Compaction 739 SY 204 Proof Rolling 1 Hour 252 Full Depth Pavement Sawing 56 FT 301 Asphalt Concrete Base, PG64-22 141 CY 304 Aggregate Base 17 CY 407 Tack Coat 128 Gal 441 Asphalt Concrete Surface Course, Type 1, (449), PG64-22 27 CY 441 Asphalt Concrete Intermediate Course, Type 1, (449), PG64-22 27 CY Sub-Total = EROSION CONTROL 659 Seeding and Mulching, Class 1 496 SY 659 Repair Seeding and Mulching 25 SY 659 Commercial Fertilizer 0.07 Ton 659 Water 3 Mgal 832 Erosion Control 2,500 Each 1.00$ 2,500.00