The leased space will be designed and constructed for innovation, collaboration and university functions. The initial programming design concept will include an open ceiling finish with a large audio-visual presence, breakout areas and meeting space. The leased space is currently unoccupied with the landlord’s work substantially completed, including an open unfinished condition (warm dark shell) with studs and insulation (no drywall) and all heating, ventilating, air conditioning stubbed to the demising wall of the location, rough-in plumbing for a potential café, and unwired floor boxes for future open seating. The Construction Manager at Risk (CMR) scope will include construction management for all trades and construction coordination and to have utility requirements in place with NEOMED procured vendors for Audio-Visual, IT, Technology, Furniture, and Branding.